A boring drill builds an exciting tunnel
This is the massive drill that was used to bore a 35-mile-long tunnel underneath the Alps from mid-Switzerland to near the Italian border:
Boring operations in the east tunnel were completed on 15 October 2010 in a cut-through ceremony broadcast live on Swiss TV. When it opens for traffic in late 2017, the tunnel will cut the 3.5-hour travel time from Zurich to Milan by an hour and from Zurich to Lugano to 1 hour 40 minutes.
Stay Connected